EVENT 04 / 05MANEUVER
Go-Around — All Engines (500–1.000 ft)
Missed approach all engines operative.
Memory Cue
Push → Pitch → Clean.
Objective
Correct GA technique, configuration, missed approach navigation.
What Examiner Watches
- TOGA push
- Pitch attitude
- Flaps 15 / gear up timing
Common Mistakes
- Slow TOGA
- Excessive pitch
- Forgetting gear/flaps
Threats / TEM
- Tailwind shear
- Traffic
Boeing Procedural Notes
- TOGA → flaps 15 → positive rate gear up → at acceleration altitude flaps up on schedule
PF Responsibilities
- TOGA, pitch GA attitude, 'Flaps 15', 'Gear up'
PM Responsibilities
- Confirm thrust, FMA, callouts, ATC
CRM Focus
Announce GA loudly and early.